New bridge on Danube River takes shape/VIDEO
The process of connecting the two parts of a new railway bridge over the Danube River in Novi Sad has started.
The shorter of New Zezelj Bridge's two arches is currently being moved into position - this work started on August 30, and will last three to five days.
- Log in to post comments