Trans Adriatic Pipeline

North Macedonia, Serbia sign deal for gas pipeline; extends Greek interconnector

Serbia and North Macedonia signed a memorandum of collaboration on Friday for the construction of a natural gas pipeline that will link the two countries and relate to another pipeline between Greece and North Macedonia.

Signing the memorandum in Belgrade were the prime ministers of North Macedonia Dimitar Kovacevski and of Ana Brnabic.

Greece – Bulgaria NG pipeline undergoes last test

The small, in length, but strategically important IGB pipeline, which connects the Bulgarian system with the Greek natural gas transmission system and the Trans Adriatic Pipeline (TAP), will start commercial operation, next month, in July. Today (17 June) the pipeline will undergo final testing  with the introduction of the last quantities of 1.5 million cubic meters of gas.

Montenegro awaits investors from Turkey

Turkey and Montenegro have agreed to make additional efforts to increase bilateral trade volume to $250 million by 2022, Perisa Kastratovic, Montenegro's ambassador to Ankara, said yesterday.

He called on Turkish investors to grab opportunities in the southern Balkan country in an online meeting with a group of Turkish journalists.

TAP signs deal with Albania to deliver first gas exit point Fier

A cooperation and handover agreement for the Fier South gas facility was signed between Trans Adriatic Pipeline (TAP) AG, the Albanian Ministry of Infrastructure and Energy, and Albgaz Sh.a., a statement from TAP said on July 7.

TAP will design, procure and construct the gas exit point with a multimillion Euro investment.

DEPA says Greece started receiving gas from TAP

Greece's state-controlled gas utility DEPA announced on Thursday that Greece started receiving natural gas from the Trans Adriatic Pipeline (TAP) after the completion of its construction in December.

DEPA signed a 25-year gas supply contract with TAP in 2013 for the supply of natural gas from the Shah Deniz field in Azerbaijan.

Pages